ShipmentRussia

Punching machine and uncoiler prepared for Russia

A shipment reference pairing a punching machine and uncoiler in one 40HQ container arrangement.

Wrapped punching equipment at the loading area.
Wrapped punching equipment at the loading area.

Main machine and coil handling

The September 2026 reference record lists one punching machine and one uncoiler for Russia. The recorded gross weights are 12,300 kg and 1,730 kg respectively, with one 40HQ container planned.

Packing preparation

Large machinery requires protective wrapping and a loading plan matched to its dimensions. Preparing the lifting route and container access helps coordinate handling.

Recorded schedule

The recorded estimates are 16 September 2026 for departure and 27 September 2026 for arrival. A planned arrival date does not confirm delivery; actual status requires a logistics update.

Let’s talk about your next project.

Share your material, part drawings and production requirements.

Contact Rucheng ↗